 Das Box 
by Michael Surface msurface@hotmail.com  
  
     
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
      
       | 
     
      Finishing Das Box 
     
    
      There is a saying that the closer you get to the end of a
      project the longer it takes, in the case of boat building this is so true. In little less
      than a week I had basically completed the major structural parts of Das Box. All I needed
      to do was to add the knees, leeboard mount, and the bottom rub strips and the hull would
      be done. I had added a little extra complexity by making a longitudinal seat similar to
      the one used by the Tortoise. I would also need to make the leeboard and rudder (I planned
      to modify the rudder design so it would be a drop down design) and the mast and sail. An
      additional distraction was that the summer break was over so back to work. This meant that
      I could only work on the boat during the weekend. 
     
    
      Week of July 10th Tuesday July 11, 2000 removed drywall screws
      from bow and replaced with galvanized roofing nails  
     
    
      
        Thursday July 12, 2000 cutout leeboard mounting pieces 
       
     
    
      
        Saturday July 15, 2000 sanded boat 
       
     
    
      
        Sunday July 16, 2000 mounted port knees 
       
     
    
      Week of July 17th 
     
    
      
        Tuesday July 18, 2000 painted port side with epoxy 
       
     
    
      Week of July 24th 
     
    
      
        Tuesday July 25, 2000 ordered one gallon of Clear Coat Epoxy
        from RAKA 
       
     
    
      
        Friday July 28, 2000 build longitudinal seat 
       
     
    
      
        Sunday July 30, 2000 finished starboard side knees, leaboard and
        mast step 
       
     
    
      Week of August 31 
     
    
      
        Friday August 4, 2000 cutout rudder, leeboard, rubstrips, and
        boom 
       
     
    
      Week of August 7th 
     
    
      
        Friday August 11, 2000 put on rubstrips 
       
     
    
      
        Saturday August 12, 2000 painted outside with epoxy 
       
     
    
      
        Sunday August 13, 2000 painted part of interior with epoxy 
       
     
    
      Week of August 14th 
     
    
      
        Tuesday August 15, 2000 finished painting interior of boat with
        epoxy 
       
     
    
      
        Wednesday August 16, 2000 painted longitudinal seat port side
        with epoxy 
       
     
    
      
        Thursday August 17, 2000 bought 7 foot oars, installed oarlocks,
        painted top and starboard side of longitudinal seat with epoxy, and put name (Das Box) on
        stern 
       
     
    
      
        Friday August 18, 2000 loaded Das Box p to take to Michigan for
        Third Annual Great Lakes Small Craft Symposium  
       
     
    
      
        Saturday August 19, 2000 at the Third Annual Great Lakes Small
        Craft Symposium 
       
     
    
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
        
      The Launching! 
     
       | 
   
 
 
  
  |